Requirements for Leaving Certificate
Planning Permission
Types
Requirements
Procedure
Construction Industry/Occupations/Design
Bill of quantities/ Specification/ Schedules
Essays
Carpenter, Contractor, Clerk of works, Architect, Engineer, Quantity Surveyor
Mortgages/Finance
Design process
Site Preliminaries
Site Exploration/ Investigation
Plant
Setting out
Excavation
Foundation
Function of Foundations
Considerations when selecting Foundation/ how load is transmitted
Soil Types
Simple Strip*/Wide/Deep Strip Foundation
Short Bored Pile*
Raft Foundation*
Pad Foundation, Step Foundation
Calculation of Width [width = (load per metre/bearing capacity of soil)]
Concrete
Manufacture
Terms
Hydration/Setting |
Concrete Mixes |
Water: Cement Ratio |
Workability |
Batching |
Placing/Compaction |
Curing (summer/winter) |
|
|
Types
Tests (Silt test, Bulking test, Moisture Content, Slump test, Hardened
concrete)
Brickwork bonding- types, terms, pointing
Roofs
Functions
Lean-to/Couple/Close Couple/Collar
Strutted Purlin*
Timber Trusses*
Trussed Rafter*
Flat Roof-
Abutment Detail |
Felt roof* |
|
Mastic Asphalt roof* |
Verge Detail |
Felt roof* |
|
Mastic Asphalt roof |
Floors
Function (1st 2nd)
Suspended Timber Floor*
Upper Floor Jointing
Floor Finishes
Partitions
Chimneys
Floor Detail*
Roof Detail*
Regulations
Doors
Ledged/Framed/Braced/Sheeted/Panelled
Fire Door
Stairs
Regulations (calculation)
Types
Ground Floor Detail*
First Floor Detail*
Plumbing
Cold Water System - Direct/Indirect
Hot Water System - Direct/Indirect
Piping Systems
Cold Water Storage Tank*
Hot Water Cylinders
Pipe Joints/ Traps
Drainage
Combined System
Separate System
Regulations for Stack System
Problems associated with Stack System
Drain tests (water, air, and smoke)
Manhole*
Septic Tank*
Regulations (percolation area, septic tank)
Windows
Casement Window
Types of Glass
Painting
Types
Procedure
Electricity
Circuits
Safety
Calculations
Heating
U-Values
Psychometric chart
Sound
Types of Transmittance/Generation/Insulation
Measurement
Terms (Square Law, Decibel, Reverberation time)
Calculations
* Scaled Drawings Required
|