Grounds

 

Gortnaclough

Ballinhassig are currently developing a new complex on a 7.2 acre site at Gortnaclough. The project will include 2 full size pitches, a 40m X 60m floodlit training area, dressing rooms, and a car park. Currently the 2 pitches have been laid out by bulldozer, trees have been planted on the boundary and drains are being laid. Also The first training sessions were held on the grounds while Crossbarry was closed in August, 2001.

Directions: From Cork City, drive on the main Bandon road (N71) until you reach the Halfway roundabout (the first roundabout after leaving Cork City). Turn right at the roundabout, across the bridge, and then turn left. Take the first (and only) right turn which is signposted for Ballinhassig Soccer Club and Barry O'Halloran Fitted Kitchens. Follow this road about a mile and a half to the top of the hill. The pitch will be on the lefthand side.

It is anticipated that Ballinhassig will play our first season in the new grounds in the 2002-2003 season. Watch this and the news sections for the latest updates on the development. The web master is currently working on a 360 degree "Virtual Reality" picture for this page.

 


Back to Main Page