Hurling Wall Construction Autumn 2006
Snags setting up the steel work which has to be tied | Larry lends a hand with Foley supervising. Bernard Doran and Barry Keating tear into it. |
MJ in the trenches | A dirty morning for the job - it spilled rain. Tomas Kehoe eyes the levels while Chairman PJ Demspey guides the concrete. Ed Kehoe and Barry help MJ. |
Ed Kehoe checks levels while Doran works the agitator.
| Another few lorry loads and we'll be right. Did I hear someone say 8 loads altogether for the foundation. And another 50 Cubic Mtrs for the wall! |