The Workshop - Construction

These are pictures taken at different stages of the construction of the workshop.

The foundations


Building the walls


All walls completed, and poles in place for the patio


Roof ready for tiling


Tiling and outside sheething done. The tiling itself is the one thing I didn't do on this project. It would have taken me too long and as it is crucial to not have leaks I left it to a pro roofer!


I made the windows myself, will double glaze for sound proofing for the neighbours


Insulation and walls completed. I only have to make the double doors to complete the main work

 
The outside
Construction
Completed
The inside
Floor plan
Tools
Jigs