|
Just
try and keep me away from home cooking in these conditions.
Takeaways a thing of the past, forever...... |
|
The
hole for the extractor fan took 50 separate holes drilled in a
circle and 4 hours of hammering with hammer and chisel. The
view of the neighbours house is nice though. |
|
We
replaced the old Cooker switch, moved one double socket and
added 2 double sockets. Plenty of shoulder grease was needed for
about 7 meter of chasing through the wall.
Good stuff to keep a man on his
toes...........
|
|
The
old Cooker switch (bottom) will be covered with Tiles and
contains a junction box. |
|
Tiling
in progress |
|
The
old cooker switch is about to be covered but the problem is how
to keep the Tiles in Place while the glue dries? |
|
Well
it just took one bucket filled with Tools, a plank, a plastic
Float and a piece of wire.
This is a Peres-Janson Trademark, do
not try it at home. |
 |
Different
angle. |
|

|
Henry
is dancing around the Kitchen unit. |
|

|
End
result, up to the next part of the IKEA Furniture |