Energy innovation Ltd.
Location |
Notes |
|
Absorption refrigeration feasibility study |
Ireland |
|
Boiler economiser retrofit feasibility study |
Ireland |
|
Combined Cycle Gas Turbine Fuel System
Re-Calibration Speedtronic Mk IV |
Edison
Thermoelectrical Marghera, Venezia, Italy |
|
CHP feasibility Study including feasibility of
IGCC with wood waste as fuel |
Ireland |
|
Conversion of Boilers from heavy fuel oil (HFO)
to natural gas |
Ireland |
Design of boiler-house gas detection system |
Combined Heat and Power (CHP) Feasibility Study |
Ireland |
CHP Feasibility study for modern food
manufacturing plant, electrical demand 3 MW(e) Project Value 2.5m |
Preparation of Proposal for 15-year maintenance
contract for the Dublin Port Tunnel facility |
Ireland |
Preparation of a detailed proposal for the
15-year maintenance contract for the mechanical and electrical equipment |
Ireland
|
Specification,
preliminary design, tender, detail design, and project management of
installation and commissioning of new 16T boiler. Project value 712 K |
|
5
MW(e)Combined Heat and Power (Cogeneration) Project; |
Ireland
|
Completed
detailed CHP feasibility study, and produced conceptual design models for
possible 5 MW (e) integrated CHP plant. Project
Value 9.15 M |
Comprehensive
Site Energy Survey and Energy Audit |
Ireland
|
Comprehensive
Energy Audit and Energy Survey carried out to CIBSE AM5 1991 - Energy Audits
and Surveys |
Project
to establish unit costs for all site energy and utilities usage. |
Ireland |
Pharmaceutical
plant energy use survey in preparation for energy market de-regulation. |
Retrofit
of 349kW(ref) Refrigeration plant with R134a |
Ireland |
Technical
evaluation of all retrofit options Project value 305 K. |
Installation
of 530 kW(ref) NH3 Refrigeration plant |
Ireland |
Specification
of new plant Project
value 800K |
Installation
of 400 kW(ref) NH3 Refrigeration plant |
Ireland |
Design
of tie-ins to existing plant Project value 661K |
Feasibility
Study on drop in HFC, HCFC and HC replacement gases for R12 and R22 for large
industrial refrigeration plant. |
Ireland |
Evaluation
of all possible retrofit options for a 430kW(Ref) R12 Sulzer refrigeration
plant with a centrifugal compressor |
Feasibility
Study and lifecycle cost analysis of 500kW(ref) absorption refrigeration plant |
Ireland |
Absorption
refrigeration at -25oC using gas turbine exhaust waste heat. Done
as follow on from a CHP feasibility study. |
Feasibility
study on Waste Water Treatment Plant sludge drying using Gas Turbine exhaust
waste heat. |
Ireland |
Study
done to evaluate ways of making the subject plants thermal and electrical
load profile more suitable for CHP |
Feasibility
study and preliminary design of system to process solvent waste as boiler
fuel using existing equipment on site. |
Ireland |
Project
to determine the feasibility of burning high calorific value waste process
solvent in a planned future gas turbine waste heat recovery boiler, or in an
existing gas fired flame tube boiler. |
Feasibility
study on centralized refrigeration plant incorporating ice / eutectic storage
and waste heat powered absorption refrigeration. |
Ireland |
Energy
reduction option in a large chemical plant with a high process cooling load
at 20oC i.e. average cooling load of 3,150 kW (Ref.) |
Project
to commission an auto-sequence control system on four 530kW refrigeration
plants. |
Ireland |
Project
value 44,430 achieving annual savings of 102,922. Auto
sequencing of start-up and shutdown avoiding part load operation on screw
compressors. |
Development
and implementation of Targeting and Monitoring system (STARK system). |
Ireland |
Implementation
of energy target and monitoring system in a large pharmaceutical plant using
existing infrastructure i.e. existing computer LAN |
Replacement
of 12" process piping headers |
Ireland |
Short
turn-around replacement of 160m of 12" process piping header. Project value 228,563 |
Reverse
Engineering Repair procedure for cast iron axial pump casings |
Ireland |
Unit
Repair cost 1,525 New item cost
8,895 each |
Reverse
Engineering Repair procedure for cast iron large tank rake drive bull gear |
Ireland |
Material
analysis and development of repair procedure for cast iron gear. |
Reverse
Engineering Repair and material selection for pump shaft, bearing and seal
bushings |
Ireland |
Cost
savings of 6,362 per anum per unit |
Pump
Selection - replacement of high
maintenance multistage gear pumps with more robust centrifugal items |
Ireland |
Repair
cost savings of 5,000 per anum per unit |
Pump
and line sizing for various fluids including viscous slurries |
Ireland |
Pump
selection taking into account capital cost, lifecycle costs including energy
efficiency and maintenance costs, and ease of installation. |
Development
of repair procedures for ASME VIII pressure vessels |
Ireland |
Pressure
vessels damaged by stress corrosion cracking. All
repairs to ASME VIII |
Development
of repair procedures for API 650 / API 653 storage tanks |
Ireland |
Erosion
and corrosion damage, all repairs to API 653 |
ABB
Camlica Hydro Electric Power Plant Constructability review |
ABB, Birr, Switzerland |
Preparation
of tender packages for issue to local mechanical and electrical contractors
for the Camlica HEPP, Turkey. |
Petrofina
Angola. Re-furbishment
and upgrade of the Pangala Gas Lift Station 3
x Waukesha L740GSI gas engines and 3 x Ingersoll Rand 4RDS-3 reciprocating
compressors |
Ireland / Soyo, Angola |
Project
value US$ 3.6 m Complete
overhaul and upgrade of gas lift facility to provide re-injection for the
Perofina / Sonangol Pangala and Quinguila on-shore fields |
Mitsuibishi
Heavy Industries (MHI) Parana 535MW(e) Combined Cycle power Plant 4 x MW 701F |
Ireland |
Development
of tender packages for local Argentinean mechanical and electrical erection
contractors |
Mitsuibishi
Heavy Industries (MHI) Una
CCGT 1 x MW 701DA - Warranty Items |
Maasvlakte, Holland / Ireland |
Low
Btu blast furnace gas fuelled unit Technical
advice on resolution on miscellaneous warranty / punch-list items |
Mitsuibishi
Heavy Industries (MHI) Saltend - Contract Management of consortium partner
subcontractor claims 3 x MW 701FA |
MHI, Takasago, Japan |
Investigation
and settlement of disputes relating to scope split in consortium agreement |
Long term Maintenance Barking Power Station
5x MS 9001E CCGT |
Ireland / UK |
Proposal
for long-term maintenance contract for gas turbines including repair of hot
gas path parts by Wood Group |
Preparation
of proposal for the erection and commissioning of 1 x GE Stag 106FA |
Ireland |
RWE
Opel IPP Germany |
GE
Fife Energy 1x MS 9001FA - Subcontractor pre-qualification and selection,
Pre-bid meeting and site survey |
Ireland / Fife, Scotland |
IPP
on Scottish Coal gasification site Fife Scotland |
Austrian
Energy Poolbeg 2 x HRSG for Seimens V94.2 conversion to combined cycle. |
Ireland |
Feasibility
study into Austrian Energy boiler tube bundle module fabrication in Ireland. Sourcing
of suitably qualified craft labour, Establish
costs, and finding suitable locations for the job. |
MS 5001M Shop refurbishment, including Major Overhaul and control
system upgrade and refurbishment Speedtronic
Mk I control system |
GE Service Shop, Jacksonville, Florida, USA |
Power
block unit conversion to stand alone unit |
MS
5001K Fuel Regulator re-calibration and start-up |
Spain. |
Haagen
temperature control |
MS
5001N Combustion Inspection, |
Spain. |
Combustion
inspection on heavy fuel oil fired unit |
MS
5001N Speedtronic Mk II Control system re-calibration and modifications |
Spain. |
Addition
of BOP contact inputs and outputs. Back-plane wiring mod.s for new sequencing. |
MS
5001K Fuel Regulator Control system retrofit |
Spain. |
Haagen
to Temcon I temperature control retrofit |
MS
6001B Installation and Mk IV Speedtronic Start-up, |
Rhode Island, USA. |
IPP
Plant - Pawtuckett Power |
MS
5001MSpeedtronic Mk I re-calibration
and start-up, |
Springville, Mass., USA |
Unit
start-up after major overhaul |
MS
5000 Parts Interchangeability Study, and Spare Rotor Program, |
GE Service Shop Basildon, UK |
Study
into interchangeability of rotor parts between different model MS 5001 and
also MS 5002 to improve GE rotor exchange service |
3 x MS 9001E Exhaust Damper retrofit and
exhaust plenum modifications |
Abu Dhabi, UAE. |
Project
included retrofit of internal insulation and cladding to GT - Boiler exhaust duct. |
MS 9001E Bearing Inspection, |
Abu Dhabi, UAE. |
Fast turn-around bearing inspection, all bearings removed without
removing the GT rotor. |
MS
5002B Speedtronic Mk II to Speedtronic Mk IV Simplex retrofit troubleshooting |
QGPC, PS3, Qatar. |
AEG
Packaged Frame 5 GT
installed in Zone 2 enclosure. Compressor
drive. |
MS
5001E Fuel regulator re-calibration, troubleshooting and start-up, |
Valentia, Venezuela. |
Re-located
unit providing heat and power for a paper mill in Venezuela |
MS
9001E (PG 9171E) Exhaust Damper Retrofit and Speedtronic Mk IV+ control
system |
Abu Dhabi, UAE. |
Project
to integrate the control of waste heat recovery boilers with Mk IV control
system. GT
Exhaust damper interlock sequencing moved from boiler control system to GT
control system |
MS
9001E (PG 9171E) Site
residency, Combustion Inspections. Control
System Speed Mk IV + |
Abu Dhabi, UAE |
One
of the first Mk IV+ sites. |
MS
5001K Major overhaul and Control System re-calibration of with Fuel Regulator
control system |
ALPART Jamaica |
GE
MAC temp. control |
De-mothballing and commissioning of 6 x
LM2500s with Speedtronic Mk IV control systems. |
Marjan GOSP 2, Marjan Field. Arabian Gulf, KSA. |
Marjan
GOSP 2 - the largest offshore gas compression platform in the world when
built. Full output of 600 MMSCFD (million standard cubic feet per day) gas at
535 psi (36 Bar), 350,000 BPD
(barrels per day) Oil |
Start-Up
1 x MS 6001B Speedtronic Mk IV+ control system. |
Port Harcourt, Nigeria. |
Project
to provide power for the NNPC / Shell Pt Harcourt LNG terminal |
Major
Overhaul and control system modifications MS 9001E (9171E) with Speedtronic
Mk IV controls. |
Abu Dhabi, UAE. |
Al
Taweelah UAE one of the largest power and desalination plants in the middle
east. |
MS
9001E (9151E) Hot Gas Path inspection, Major Overhaul and control system
re-calibration, Speedtronic Mk II with ITS control system |
Beersheba, Israel. |
Hot
gas path inspection developed into major inspection and removal of compressor
stator vanes due to FOD |
Start-up
MS 9001E (9171E) with Speedtronic Mk V control system. |
Port Dickson, Malaysia |
One
of the first IPPs in Malaysia. The first IPP to synchronize with the grid. Fast
track construction schedule |
Start-up
of 1 x MS 6001B with Speedtronic Mk V control system. |
Miri, Malaysia |
Fast
track start-up of simple cycle GT unit in power starved area of northern
Sarawak (Borneo). Project
value US$ 16M. |
Mk
V controls troubleshooting on full load string test of LM 6000 Speedtronic Mk
V Control system |
Nuovo Pignone, Massa, Italy |
First
Nuovo Pignone packaged LM 6000. First
LM 6000 with Mk V and Woodward fuel system. Generator drive for offshore
application with Hamilton Oil UK. |
Resolution
of warranty items on 1 x MS 6001B installation, mechanical and controls,
Speedtronic Mk V and Historian |
Miri, Malaysia |
Resolution
of punch-list items and problems with integration of new 35 MW Frame 6 with
existing 16 smaller GTs (3MW to 12
MW) on the power grid. |